-40%
NextEra Energy Southwest Mesa Wind Project Dedication Ceremony Boot
$ 18.48
- Description
- Size Guide
Description
NextEra Energy Southwest Mesa Wind Project Dedication Ceremony BootFPL Energy Florida Power & Light
Dimensions: 5.5" to boot tip x 8" Ht
City: Crockett, Upton
Commissioning:
107 turbines:
Neg Micon
NM48/750
(power 750 kW, diameter 48.2 m)
Hub height:
Total nominal power: 80,250 kW
Operational
Onshore wind farm
Developer:
Cielo Wind Power
Operator:
NextEra Energy Resources
Buy with confidence: I guarantee my merchandise to be as represented. Thanks Holly